ILF Kazakhstan Engineering
Atyrau, www.ilf.com
Construction, Real Estate, Architecture... Show more
HSE Manager Projects (EPS, Pipelines and Pump Stations
Construction and Engineering Activities – Project Management Team
IIF PROJECT.
Directed 19 advisors and 2 IIF Coordinators Team. Delivered assistance to JMJ IIF Consultants to deliver commitment workshop for National Project Leaders, led IIF workshop for Site and Project leaders in CPC Expansion Project with the support of JMJ consultants. Controlled IIF structure (IIF Orientation – 4 hours for each on the project, IIF In Action Module 1 and Module 2 (TSTI field practical training and TSTI Observations), Living IIF (RRR – Reach Out, Do it Right, Raise your Voice), and due to a huge amount of miles run by mobile vehicle equipment and had to deliver IIF Driving. Achieved 7,000,000 man hours without LTI. Managed medical, sanitary, health and hygiene issue in remote canteens, camps and clinics; contributed in the audits, site inspections, workshops to accept temporal site buildings and facilities (living camps, offices); Implemented security activities on the Project during public holidays, public event, opening ceremony with participation high rank guests.
Spearheaded IIF culture and IIF Cycle Life, stop work authority, 12+1 (Lifesaving Rules), Safety Improvement Plan, safety observation cards, Stop Work Authority, HSE hazard matrix and TSTI (Total Safety Task Identification) tools. IIF Central Leadership Workshop on CPC Expansion Project in Atyrau, contributed in Central Leadership IIF workshop in Moscow, Krasnodar and Novorossiysk.
Expedited Technical Safety Support by HSE advisers to Main Line Pipeline Project construction, De-oiling, Filling Oil into pipeline systems, Pipeline Removal Works, Shut down (tie-ins) activities, Hidrotests, pressure testing, upgrade of Oil Pump Stations (brown Field Projects), New Pump Stations Projects (Greenfield), OHPL 220/10 kW, Substations, OPGV, Switchgears, 220 kW, Oil Tank Erections (20.000 mᶟ).
Implemented Safe Work Practices in confined spaces, work at height (by using man lifts, scaffolding platforms, life lines working over OHPL pylons), heavy and regular lifting operations, trenching and excavating activities, gas hazardous works, hot works, SIMOPS, commissioning works in live zones areas, energized facilities, Safety Campaigns over Transport Policy.
Performed pre- mobilization audit of project contractors, HSE minimum requirements check, commissioning of construction camp facilities, medical facilities, construction site arrangements prior to construction activities. Delivered legal support to General Contractors to get RoK approvals to start works on Project (environment approvals, tech specs tie-ins.
Collaborated with international auditors ISO 14001, OHSAS 18001, ESIA; Preparation and approval of HSE budget; Assisted subcontractor supervisors with investigations of incidents involving workers, equipment or property damage, investigating MVAs; guaranteed Company and contractor personnel receive all required RoK, Incident & Injury Free and task specific training prior to commencement of work.