Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 47 years, born on 8 August 1977
Moscow, metro station Leninskiy Prospekt, willing to relocate (Australia, Austria, Great Britain, Germany, Greece, Denmark, Spain, Italy, Canada, Cyprus, Monaco, Netherlands, Norway, UAE, Poland, Republic of Seychelles, USA, Serbia, Slovakia, Slovenia, Thailand, France, Croatia, Czech Republic, Switzerland, Sweden, Scotland), prepared for business trips
Projects manager
350 000 ₽ in hand
Specializations:
- Sales manager, account manager
Employment: full time
Work schedule: full day, flexible schedule, remote working
Work experience 28 years 10 months
February 2012 — currently
13 years 2 months
B3G LIMITED
Great Britain, www.b3-g.com
Business Services... Show more
Managing Director / Shareholder
March 2012 – till present B3G Limited, Hampton Hill, Surrey, UK
Share holder and Managing Director of the UK office.
Engineering and consulting company. Registration of the company in the UK from scratch, full legal support, and opening bank accounts, project management company in Russia, the preparation of commercial proposals for new projects, the development of the company's business in the United Kingdom, the preparation of financial reports on the activities for the company's shareholders.
Projects:
November 2016 – February 2017 Mandarin Oriental Hyde Park hotel renovation, London, UK
Coordination meetings with the Design team and the Client’s representatives. LV installations review, daily progress reports and 2 month program ahead, control of other sub-contractors on site (PH and HVAC), site issues solving and preparations of the design changes for as build documentation. Review of contractor’s RAMS, Fee proposals, Materials Submittals sheets, design coordination on site, temporary power connections for the site operations.
September 2016 – November 2016 Detail Design of renovations of Cross Anglia rail stations (Brentwood, Gidea Park, Stratford) London, UK
Detail design of renovation of Electrical power supply services for several platforms include upgrade of CMS infrastructure, DOO cameras and power supply, electrical calculations in AMTECH and Dialux, CMS calculations and full coordination of M&E Services in Revit MEP.
May 2016 – September 2016 Fit-out (Cat B) Detail Design of Financial Times 5 store historical building (Grade II*), London, UK
Full fit-out Detail design (stage B) include electrical systems for 12000m2 office fit‐out, UPS power backup systems, central lighting control via DALI interface and LCM controllers. The project target was to achieve BREAM Excellence certification. Coordination meetings with Design team and the Client’s representatives. Design of CCTV, Fire alarm, Access Controls and BMS systems. Calculations in AMTECH and full coordination of M&E Services in Revit MEP.
October 2015 – April 2016 Full Detail Design of SABIC Data Center (12MVA) Phase I, II, III Jubailh, Saudi Arabia
Full M&E Detail design of Data Center include 4No of DATA HALLS 1500kW of IT loads each one. M&E Project coordination and leading team of 15 Engineers. New MV/HV/LV infrastructure, 5No Prime rated MV‐Generators (12 hours of autonomy), include fuel pipework’s and controls, LV modular switchboards with 5000A main incomers. Lighting control based on DALI for all zones of Phase I, II and III. External lighting design. Coordination meetings with Design team and the Client’s representatives. Design CCTV, Fire alarm, Access Controls and BMS systems. Calculations in ETAP and full coordination of M&E Services in Revit MEP. This building has an extended blast protection against of bomb explosion equals to 450 kg of TNT.
May – July 2015 Detail Design of HP Data Center (5.8MVA) Phase II. Doxford.
Detail design of unique HP Data Center for new edge of IT technology. Include new HV
infrastructure, HV‐Generators (72 hours of autonomy) include fuel pipeworks and controls, LV modular switchboards with 5000A main incomers. Lighting control DALI for all zones of Phase II. External lighting design. Calculations in Amtech, Contractor’s design and Technical submissions review, meetings with design team on site.
May – October 2015 Detail Design Century Link Data Center. HV Infrastructure replacement project.
11kV Infrastructure replacement for existing Data Centre. Full detail design of new HV infrastructure include new HV switchgears, new controls panels and new containerized modules. Site surveys, design meetings with Contractors and Client’s representatives. Protection grading diagrams and calculations for HV site in Amtech Power Net. Design of controls and blocking diagrams for HV / LV site. Review of Technical submissions from suppliers and from sub‐contractors.
May – June 2015 Concept Design for High‐End Residential tower O2. Greenwich, London. UK
Concept design of all Electrical services for a tall high‐end residential mix use complex (part of O2 area). Design calculations for all electrical services, include lifts, elevators, life safety equipment up to stage C.
September 2014 – May 2015 Detail Design of Infinity Data Center (30MVA) Phase II, Phase III.
Detail design of Award winning Infinity Data Center include HV Transformers, HV-Generators, UPS back-up for 3 MVA each set, LV modular switchboards with 5000A main incomers. Lighting control DALI for all zones Phase II and Phase III. Calculations in Amtech, Contractor’s design review, meetings on site, snuggling reports, test & commissioning of transformers, LV switchboards and UPS.
February 2015 – April 2015 Detail Design of GDC Data Center (3.5MVA) Renovation. Phase VII
Detail design of renovation GDC Data Center include HV Transformers, LV-Generators, UPS back-up for 3 MVA each set, LV modular switchboards with 5000A main incomers. Lighting control DALI for all zones Phase VII. Calculations in Amtech, Contractor’s design review.
September 2014 – November 2014 Detail Design of Aberdeen Data Center (15MVA) Phase I
Detail design of Aberdeen Data Center include HV Transformers, HV-Generators, UPS back-up for 3 MVA each set, LV modular switchboards with 5000A main incomers. Lighting control DALI for all zones of Phase I. Calculations in Amtech, Contractor’s design review and meetings on site.
August 2014 – Legislation of new wind turbine generators ARIVA (Germany) for UKPN
Preparation of a report regarding of use of ARIVA wind turbines in the UK for UKPN Client. Review of ARIVA’s design documentation in accordance with the UK regulations and codes.
October 2013 – June 2014
Full M&E Design approach for 1 200 000 m2 Residential, Schools and Mixed Use Development in St. Petersburg, Russian Federation. My duties were: control of M&E Design team in London office (15 Engineers), meetings with the Client (London – St. Petersburg), preparation of set of M7E documentation package for submission and approvals with Local State authorities in Russia, report back to Director of M&E Design Department.
August 2013 – October 2013 RFU Twickenham refurbishment, London, UK
Full design of renovation infrastructural of Electrical services for RFU Twickenham stadium. Lighting design and calculations, design of replacement of 11kV transformer substations, design for installation of 2x2MVA Diesel Generators sets. Review of Contractor’s Documentations, Design approvals with Clients and Contractors, Site meetings and site supervisions. Control of design team 2 Electrical Engineers and 2 CAD operators.
August 2013 – Dream land, Moorgate, UK
Full scheme design for all Electrical Services. Scheme stage included a design for refurbishment of listed building of Dream Land complex. Site investigation services, proposal for new lighting design and power distribution systems, design meetings with an Architect and Client’s representatives.
April 2013 – July 2013 Contract role in Michael Popper Associates, Twickenham, Surrey, UK
Senior Electrical Design Engineer
April 2013 - High-end residential project on Holland Park Street, London, UK
The full Electrical Design. This is a listed building with all additional requirements and regulations apply. Lighting design and calculations, climate control, blinds control base on KNX protocol. M&E Project coordinator for all other systems. Design approvals with a Client. I designed a bespoke product base on GIRA equipment especially for this Project.
June 2013 - students accommodation project for Study Inn, Coventry, UK
Full electrical design based on pre-wired modular systems for whole building.
June-July 2013 – Renovation of St. Clare College, Oxford, UK
M&E design review for St. Clare College project. That include two new buildings and one historical building refurbishment.
2012 Hyatt Golden Horn Hotel, Vladivostok, Russia
Project Director for detail design stage of Hyatt Golden Horn (5* hotel with 250 keys and SPA).
2013 Hyatt Regency, Rostov on Don, Russia
The Project Director for Hyatt Regency in Rostov on Don (65 000 sq.m.) Concept and Scheme design, coordination meetings in London, Moscow and in Rostov on Don, submission whole set of documentation in Local authorities.
October 2001 — April 2012
10 years 7 months
IDA (Industrial Design Associates)
Great Britain
Business Services... Show more
Business Development Manager, Russia & CIS / Project Manager / Senior Electrical Engineer /
M&E Consulting Engineers – Senior Electrical Engineer
Responsibility for full design of electrical building services, engineering and
project management for both new and refurbishment projects. Project
experience has covered a wide variety of sectors including Commercial,
Hotel & Leisure, Retail, Industrial, Logistics, Retail, Education and Transport.
2011 Hyatt Golden Horn Hotel, Vladivostok, Russia
Concept design for 200 key 5* Hotel and further supervision of detailed
design developed by the contractor, including review of the project with
recommendations on design and compliance with international Hyatt
standards.
2011 Hyatt Burny hotel, Vladivostok, Russia
5* Hotel and 8,000m2 Spa (250 key). Detailed design of electrical systems to
meet Hyatt international standards.
2011 Deutsche Bank offices, Moscow
Design of electrical systems for 7,500m2 office fit‐out, including UPS Systems
and lighting central systems. The project achieved LEED Gold certification.
2010 Leipzig Hotel, Kiev, Ukraine
Concept Stage for electrical power supply 10 kV/0.4 kV. Calculation of main
loads. Project under Design stage.
2009 Mercury Boutique 5* Hotel, Dagomys (Sochi Region), Russia
Full set of working documentation for MEP services. Senior Electrical
Engineer, control of Electrical Design team, meetings with clients.
2009 Hyatt Residency 4*Hotel and Retail Mall, Rostov‐on‐Don
Concept stage. Design and calculations for electrical power supply 6kV and
0.4kV. Design for diesel generator set and fuel supply.
2008‐2011 Four Seasons Hotel, Park Lane, London
5* Luxury Hotel and Spa.
Scheme design and detailed design for all
Electrical Services including 10kV power distribution systems.
Finalist ACE Engineering Excellence Awards 2011
2007‐2008 Logistics Complex in Rostov‐on‐Don (350,000m2)
Concept Design of main power distribution for the site (10kV and 0.4kV0,
general calculations of loads and consulting with other engineers to comply
with Russian norms and regulations.
2007 Associated Press, London
Office fit‐out. Main calculation of loads, design of Generator and UPS power
supply systems for server room and mission critical equipment.
2007 Terra Firma Office Complex, London
Design of lighting systems and main, sub‐main power distribution.
2007 Multifunctional Business Centre “Ekaterinodar”, Krasnodar, Russia
Concept design and stage project for all electrical systems, including all
calculations for Design main switch room and transformer substation; team
leader for consulting and control of project.
2007 Bowood Hotel, Spa and Golf Resort, Wiltshire, UK
Scheme design, tender and detail design, site supervision for all electrical
systems for new purpose‐built hotel complex.
2006 Deutsche Bank, Moscow
Metering systems, Call Systems, Motor Control Centres, Standby Generator
Plant, UPS Systems, Power Factor Correction Plants, Lightning Protection
and Earthing Systems.
2006 Ducat Place III, Moscow – various blue chip fit‐outs
Total fit‐out projects comprised 90% of building space:
1) Citibank
2) Clifford Chance
3) ConocoPhillips
4) Cushman & Wakefield
5) De Beers
6) Fitch Ratings
7) Goldman Sachs
8) Hines
9) Latham & Watkins
10) Sony Pictures
Electrical design of Guaranteed Power Systems for banks and server
equipment, Relay Protection Systems, Metering Systems, Call Systems,
Motor Control Centres, Standby Generator Plant, UPS Systems, Power
Factor Correction Plants, Lightning Protection and Earthing Systems.
Nov 2001 – March 2007 IDA International Limited, Moscow Russia
M&E Consulting Engineers – Electrical Engineer
2005‐2006 Sheremetyevo 3 Terminal D Airport Terminal, Moscow
New International Airport Terminal Building, 170,000m2 (10,000,000
passengers per annum). Design of Relay Protection Systems, Metering
Systems, Call Systems, Motor Control Centres, Standby Generator Plant, UPS
Systems, Power Factor Correction Plants, Lightning Protection and Earthing
Systems, Sub‐station.
2005 Krasnoyarsk Planeta Multifunctional Retail Complex, Krasnoyarsk
200,000m2 multi‐function building. Relay Protection Systems, Metering
Systems, Call Systems, Motor Control Centres, Standby Generator Plant, UPS
Systems, Power Factor Correction Plants, Lightning Protection and Earthing
Systems, Transformer Sub‐station.
2003‐2005 Pilkington Glass Factory, Moscow Region
Electrical design of 140,000m2 new build Float Glass Factory
Relay Protection Systems, Metering Systems, Call Systems, Motor Control
Centres, Standby Generator Plan, UPS Systems, Power Factor Correction
Plants, Lightning Protection and Earthing Systems, Transformer Sub‐station.
2003 Sakharova Street Class A Office Building, Moscow
MEP Project Manager for 132,000m2 new build multifunctional
development, including Class A+ office areas in 3 buildings.
2002 Jewish Centre, St Petersburg
Electrical engineering design for 7,000m2 mixed use development.
2002 TV Art School of V V Pozner
Electrical and weak currents designer for 19,400m2 multifunctional office
building with underground parking, school facilities, shops and A1 offices.
2001 Citistar Retail Complex, Kurskaya Square, Moscow
Electrical Engineer responsible for the development of electrical drawings
included in the working design of two retail outlets, total area 250m2.
June 1996 — September 2001
5 years 4 months
Cunin S.A.
Russia
Construction, Real Estate, Architecture... Show more
Electrical Engineer / Director of Electrical Design team
French MEP Contractor – Lead Electrical Engineer
1999‐2000 Oil complexes in Novorossiysk, Russia
Lead Electrical Engineer. Electrical and firefighting system design. Team
consisted of American and European specialists. Basic documentation
development, calculations, approvals, re‐design of Electrical system.
Site area =180 Ha
1998‐1999 Russian State Library, Moscow Book Storage refurbishment
Lead Electrical Engineer. Development of power distribution and building
management system. Preparation of scheme design, selection and
procurement of equipment, project management, development of details
and design for accelerated equipment installation. Re‐design of main
firefighting systems, issue of as‐built documentation. Site area 50,000m2.
1998 Government project in Nemchinovo Village, Moscow Region
Electrical Engineer. Development of scheme design in a team including
European engineers. Project supervision, development of as‐built
documentation, scheme design approval. Site area: 120,000m2.
1997 Air Force project in Zhukovsky, Moscow Region.
Electrical Engineer. Power supply and distribution design, in a team
including European engineers. Project supervision, development of as‐built
documentation, scheme design approval. Site area: 10,000m2.
Skills
Skill proficiency levels
About me
* Electrical Building Services Engineer with 21 years of experience * Project Director / M&E Design Manager / Principal Engineer * MV/HV/LV extensive design and installation design * LUL and Rail experience * M&E Construction Manager * Data Centers TIER-II / TIER-IV * High-end residential * Offices Cat A & Cat B * 5* hotels (Hyatt, Hilton, Marriot, Four Seasons) * Responsible for all aspects of design and M&E co‐ordination of building services including design, survey and site supervision * BIM modeling (Revit MEP) * Project Management experience also included the preparation of proposals for tender submission * Business development role to create new business leads via attendance of trade exhibitions in Europe and general networking opportunities; building key marketing relationships for new and existing business * Full electrical calculations in Amthech or ETAP include LV, HV and MV sides. Lighting calculations in DiaLux, Relux and Calculux
IT Skills
Lighting calculations and modelling using: Dialux, Relux, and Calculux. Calculation software: AmTech,
Hevacomp. AutoCAD, MS Office, MS Project, SisPro, EXPro, XLPro, Auto LISP, Photoshop, Corel Draw,
Adobe Illustrator, Quark Express
Professional Qualifications
1992‐1996 Moscow Energy Institute, Moscow Region Russia ‐ Technician Electrician
1997 Cunin SA, Contrexeville Cedex, France – in‐house training in Autocad and
Electrical Engineering industrial applications
1998 Moscow Architecture Institute, Russia – Publishing Design course
Higher education
1996
Moscow Energy Institute
Industrial Energy, Diploma
Languages
Professional development, courses
2008
In one by Legrand
Legrand, Certificate
2006
SISPro
Schneider Electric, Certificate
1998
3D modeling
MARHI, Certificate
1996
AutoCAD
AutoDesk (France), Certificate
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Great Britain, Russia
Desired travel time to work: Doesn't matter